Terry Sayther Automotive

European Tour 2002

| <- Back | Home | Next Page -> |

(Click thumbnails for big photos)

T minus 5 weeks

The replacement floor panel has been welded in place on the driver side and is almost done----almost on schedule. The rusted out inner rear wheel well on the left side has been cut out and a replacement panel is ready to go in. 

T minus 4 weeks

Left side floor and rocker panel are done, left inner wheel well replacement is done, left inner front lower pillar area rust is repaired. Rusty right floor and rocker panel have been cut out and the replacement floor is almost in place.

Top

| <- Back | Home | Next Page -> |

 
Terry Sayther Automotive İMMIII. This page was last modified on  03/29/2004 04:49:33 PM   Questions?  Email eags